SuperMemo 18 HelpAll articles

File : Element relative priority.jpg

Original file (1,555 × 966 pixels, file size: 811 KB, MIME type: image/jpeg)

Figure: A simple way to get the feel of the relative importance of a given element is to look at the After and Before fields in the Element priority dialog box (Alt+P). In the picture, an extract from a Wikipedia article about the glymphatic system receives priority 42%. This priority is comparable with topics about morpheeins and about the autapse term.

The following 2 pages use this file: